The Padma Bridge is a multipurpose road-rail bridge across the Padma River under construction in Bangladesh. It will connect Louhajong, Munshiganj to Shariatpur and Madaripur,
linking the south-west of the country, to northern and eastern regions.
Padma Bridge is the most challenging construction project in the
history of Bangladesh.
The two-level steel truss bridge will carry a four-lane highway on the upper level and a single track railway on a lower level.
With 150 m span,6150 m total length and 18.10 m width it is going to
be the largest bridge in the Pawdda-Brahmaputra-Meghna river basins of
country in terms of both span and the total length.
The project covers three districts —Munshiganj (Mawa Point/North
bank), Shariatpur and Madaripur (Janjira/South bank). The total area of
land to be acquired and required for its components is 918 hectares
(2248.63 acre). The requisition of land for the construction yard will
be for six years on a rental basis. As per the new design, an additional
144.04 ha (355.93 acre) has been identified for acquisition, bringing
the total to 1062.14 hectares (2624.61 acre). This additional land is
required because project site lost significant land due to erosion, for
transition structures and due to a change in railway alignment
After allegation of corruption by some people associated with
project preparation the World Bank withdrew its commitment and other
donors followed. However, the corruption allegations were subsequently
found to be false and without merit and the Canadian Court subsequently
dismissed the case. The project is now being funded from own resources of the Government of Bangladesh.
The Bangladesh Bridge Authority (BBA) invited the
pre-qualification tender for the project in April 2010. Construction of
the bridge was expected to commence by early 2011 and be ready for major completion in 2013 (and complete all sections by late 2015).
The proposed Pawdda Multipurpose Bridge Project will provide direct
connectivity between the central and southwestern part of the country
through a fixed link on the Pawdda River at Mawa-Janjira points. The
bridge will contribute significantly towards facilitating the social,
economic and industrial development of this relatively underdeveloped
region with a population of over 30 million. The area of influence of
the direct benefit of the project is about 44,000 km2
(17,000 sq mi) or 29% of the total area of Bangladesh. Therefore, the
project is viewed as very important infrastructure towards improving the
transportation network and regional economic development of the
country. The bridge has provisions for rail, gas, electric line and
fibre optic cable for future expansion. The Bangladesh Bridge Authority
is the executing agency of the project.
On 17 June 2014,An important progress has been made in
construction of Pawdda Bridge. A construction firm, China Major Bridge
Engineering Company Ltd has been selected to construct the long aspired
bridge on the river Padma.The 6.15 km bridge, costing an estimated ৳91.72 billion
(US$1.2 billion), will connect 21 southern districts with the
capital.This mega project would be completed by the end of 2018. A work
order for river management issued in August 2014.
China proposed building the bridge on the build-own-transfer
(BOT) basis by investing $2 billion or 70 percent of the project cost.
Four companies - China Major Bridge Engineering Company, Daelim-L&T
JV and Samsung C&T Corporation - purchased the tender papers. But
only the Chinese company submitted their financial proposal on 24 April
2014.
The state-owned company has constructed structures like the famous 36 km Hangzhou Bay Bridge, the longest sea-crossing bridge in the world.
For more information, click here.